7 Engineering Drive 1, Block E3A, #06-01

Database


System Type
Installed Between
and
System Integrator
Technology
Location
Performance Data
Thumb System Name System
Size  
System
Type    
Commissioned     System
Integrator
Technology Tilt     Location Performace
Data
Available
Action   
HuaGuanAve 16.62516.63        Residential 202310Oct 23 Energetix Topcon n-type mono-Si   Upper Bukit Timah Yes View
ESSEC Business School 24.424.40        Commercial 202310Oct 23 WEnergy Global Topcon n-type mono-Si 10° Buona Vista Yes View
Calvary Bible Presbyterian Church 110.2110.20        Commercial 202310Oct 23 Energetix Back contact n-type mono-Si   Jurong Yes View
Singtel (Seletar) 174.945174.95        Industrial 202309Sep 23 SolarGy PERC, PERL or PERT p-type mono-Si   Yes View
SpringleafLane 12.91512.92        Residential 202309Sep 23 Energetix     Springleaf Yes View
PalmDr 13.77513.78        Residential 202309Sep 23 Energetix Topcon n-type mono-Si   Katong Yes View
PSC Corporation Ltd, Jln Boon Lay 518.105518.11        Commercial 202309Sep 23 Energetix Back contact n-type mono-Si   Boon Lay Yes View
Faxolif Industries, Tech Pk Cres 421.66421.66        Industrial 202309Sep 23 Energetix Back contact n-type mono-Si   Tuas Yes View
Ascension Church 25.6525.65        Commercial 202309Sep 23 Energetix Back contact n-type mono-Si   Potong Pasir Yes View
JlnKemuning 18.0518.05        Residential 202309Sep 23 Energetix     Sembawang Yes View
MerrynRd 12.86512.87        Residential 202309Sep 23 Energetix Topcon n-type mono-Si   Novena Yes View
BraemarDr 9.59.50        Residential 202309Sep 23 Energetix Topcon n-type mono-Si   Serangoon Garden Yes View
HillcrestRd 10.69510.70        Residential 202309Sep 23 Energetix PERC, PERL or PERT p-type mono-Si   Watten Estate Yes View
JalanGrisek 12.4512.45        Residential 202309Sep 23 Energetix Topcon n-type mono-Si   Kembangan Yes View
Hock Hua Group 582.32582.32        Industrial 202308Aug 23 Energetix Back contact n-type mono-Si   Ang Mo Kio Yes View
International French School 684.4684.40        Educational 202308Aug 23 Energetix Back contact n-type mono-Si   Ang Mo Kio Yes View
JlnLimauManis 20.33520.34        Residential 202308Aug 23 Energetix Topcon n-type mono-Si   Upper East Coast Yes View
SunsetHts 23.7523.75        Residential 202308Aug 23 Energetix Topcon n-type mono-Si   Upper Bukit Timah Yes View
VictoriaParkRd 49.87549.88        Residential 202308Aug 23 Energetix Topcon n-type mono-Si   Bukit Timah Yes View
GallopParkRd 16.616.60        Residential 202308Aug 23 Energetix Topcon n-type mono-Si   Bukit Timah Yes View
TamanPermata 13.313.30        Residential 202308Aug 23 Energetix Topcon n-type mono-Si   Bishan Yes View
Chu Lin Rd_1 18.97518.98        Residential 202308Aug 23 Eco Roof Power Topcon n-type mono-Si Bukit Batok Yes View
Bethesda Church, Bedok 187.15187.15        Commercial 202308Aug 23 Energetix Back contact n-type mono-Si   Bedok Yes View
International Business Park 106.95106.95        Commercial 202308Aug 23 Eco Roof Power Topcon n-type mono-Si 10° Jurong Yes View
Total installed capacity signed with NSR (kWp): 367,039.66